← Back to blog

What DEIS Plus brings, and the one plan it asks for

Circular 0076/2026 issued on 3 November and it is the implementation handbook for DEIS Plus, the new layer of the DEIS programme for a small cohort of urban primary and post-primary schools serving communities with the highest concentrations of educational disadvantage. The first implementation plan runs 2026 to 2028, with the first supports already in place for 2026/27 and more arriving in 2027/28.

If your school is in the scheme, the circular is twenty-five pages and most of it is good news about resources. The planning requirements are gathered into a few paragraphs, and one footnote in particular is worth bringing to the next in-school management meeting.

What the scheme brings

The supports sit under three priorities, and the headline items for a primary school are these:

Wellbeing. Every DEIS Plus school gets a dedicated teacher post as Positive Mental Health and Wellbeing coordinator, with the recruitment detail in Circular 0031/2026 and a cap of five years in the role for any one teacher. All staff get professional learning on nurturing, trauma-informed environments. Education Wellbeing Practitioners arrive for primary schools in 2026/27, one per cluster of four or five schools, working under NEPS psychologists, and the counselling pilot extends to more DEIS Plus primary schools in 2027.

Leadership and engagement. All DEIS Plus primary schools get an administrative principal. The administrative deputy principal threshold drops to 251 pupils, with release days for smaller schools. Two days a week at 151 to 250 pupils, one day a week at 150 or fewer, based on enrolment the previous 30 September. Every school gets its own full-time Home School Community Liaison coordinator rather than a shared post. The DEIS grant increases from 2026/27, a breakfast club project begins, and the Anseo attendance framework rolls out through Tusla.

Services. Community Link Workers shared across schools, more School Completion Programme funding over time, priority access in the phased expansion of occupational therapy and speech and language therapy to mainstream schools, and stronger links to youth services.

The planning ask

The footnote says “No additional or separate plan is required in respect of DEIS Plus.”

The whole planning requirement is that DEIS Plus supports are integrated into the DEIS action plan for improvement the school already keeps, and that this one plan also serves as the school’s improvement plan for SSE. One plan, three jobs. The circular asks that targets in it are meaningful and ambitious, that actions are both universal and targeted, that children and parents are involved in the evidence-gathering, and that the plan is monitored during the year rather than reviewed once and shelved.

There is a record-keeping duty alongside. Schools must be able to show how DEIS Plus resources are used and how impact is monitored through the planning process, and enrolment and attendance data on POD must be accurate and current, with the usual Tusla returns on time. Retention of the supports is tied to engaging with the action planning and its reporting. A Gaeltacht-recognised school in the scheme carries its language criteria in the same action plan.

If your school believed it should have been identified for DEIS Plus and was not, the appeal process is set out in Circular 0045/2026.

One plan, kept current by the year’s work

The shape the Department is asking for is a single living document of priorities, targets, actions, evidence and review. That is the same shape as the whole-school planning guidance and the new SSE arrangements in Circular 0084/2026, and it rewards a school whose planning already runs in one place.

In Pleanáil, the School Plan page on a principal account holds the school’s curriculum plans, context statement and SSE Record and Action Plan together, with an action plan table, review dates and one-click PDF export for the board or an inspector. The monitoring evidence underneath is the planning and monthly records the staff keep anyway. For a DEIS Plus school taking on a wellbeing coordinator and a bigger grant this year, that keeps the reporting duty small.

If your school is in DEIS Plus and the action plan needs a home, it can live beside the planning that proves it. Talk to us about Whole School.

Plan against the real 2026 curriculum

Pleanáil loads the redeveloped and 1999 curriculum for you. Tick the Learning Outcomes, tap a suggestion or two, and your fortnightly plans, Cuntas Míosúil and long-term plans assemble themselves. A plan that used to take an evening takes about fifteen minutes.

Start your free 30-day trial

For solo teachers and whole schools.